JP75 Launching Gantry 16

JP75 Launching Gantry 16

Model NO.: JP75 Segmental Launching Gantry
Type: Launching Gantry
Sling Type: Wire Rope
Power Source: Electric
Certification: ISO9001: 2000

Features

Parameters

Application

(1) Reasonable structure
(2) Favorable performance
(3) Smooth starting and stopping
(4) Safe and reliable traveling
(5) Low noise, commodious cabin and wide view
(6) Convenient maintenance, excellent exchangeability for parts and components
(7) Saves electricity

Safety feature:
(1) Weight overload protection device
(2) Lifting height limit device
(3)Low Voltage protection function
(4) Phase sequence protection function
(5) Emergency stop function

Control method:
(1) Pendent line control
(2) Remote control
(3) Cabin control
(4) Choose any two together

Item Parameters or ability
Span 50m/75m (minimum/maximum)
Working level of the whole machine A3
Maximum longitudinal slope +2.35%,-3.4%
Bridge transverse slope ±2%
Minimum radius of horizontal curve 2500m
Maximum lifting weight (not including spreader) 150t
Applicable segment length 3m, 3.55m, 1.8m
Segmental height/width 4.25m/20.8m
Maximum segmental weight (not including spreader) 130t
Maximum horizontal speed of the whole machine 0.5m/min
Longitudinal speed of the whole machine 0-1m/min
Maximum wind condition of longitudinal and horizontal movement ≤16m/s
Spreader rotation 360º
Transverse adjustment angle of spreader ±4%
Longitudinal adjustment angle of spreader ±4%
Maximum transverse adjustment distance of lifting trolley ±0.7m
Beam feeding type Lift from water
Power supply requirements 380V, 50Hz, three-phase four-wire system to provide power
Main girder quantity/length 2/120m
Front legs quantity 1
Middle legs quantity 2
Back legs quantity 1
Auxiliary legs quantity 2
Lifting trolley quantity 2
10t crane quantity 1
Hanger 2 sets
Appearance size at working of the whole machine L:120m W:11.8m H:14m
Weight of the whole machine 680t
Power of the whole machine 210kw

JP75 Precast Segmental Launching Gantry
Project name: Babahoyo River Bridge, Guayaquil City, Ecuador
Project introduction: Babahoyo River Bridge project is located in Guayas Province, Ecuador, it is the cross-river bridge between Duran City and Guayaquil City with total length of 2,185m, and there are 26 main bridge piers, it needs to set up 26-span beam segments. The whole bridge section includes 2.35% uphill section and 3.4% downhill section. The main bridge is a prefabricated suspending 75m span continuous box girder, and the bridge approach at both sides is pre stress T beam with 30m span.
Span combination: 3x30m+50m+25x75m+50m+4x30m=2,185m. This bridge main girder single arrangement is pre stress concrete continuous box girder, the main girder section is single box single room inclined web box type section, box girder roof is 20.8 meters wide and box girder bottom is 8.0-9.115m wide and 4.25-3m high, thickness of web is 45cm, there is 2% cross slope on the box top. This bridge erecting machine is applied to the installation of 572 pieces of beam section of this project.

JP75 JP75-1