Resources

  • 01 Company Profile
    01 Company Profile
  • 02 Incremental launching system & Synchronous Lifting System
    02 Incremental launching system & Synchronous Lifting System
  • 03 Post tensioning and cycle grouting system
    03 Post tensioning and cycle grouting system
  • 04 High pressure hydraulic cylinders
    04 High pressure hydraulic cylinders
  • 05 Launching gantry
    05 Launching gantry
  • 06 Pile foundation engineering equipments
    06 Pile foundation engineering equipments
  • 07 Intelligent jacking formwork platform for High-rise core
    07 Intelligent jacking formwork platform for High-rise core
  • 08 Heavy lifting and heavy transport
    08 Heavy lifting and heavy transport
  • Incremental launching system for steel box girder bridge construction
    Incremental launching system for steel box girder bridge construction
  • 3D adjustment system for bridge girder positioning and adjustment
    3D adjustment system for bridge girder positioning and adjustment
  • Intelligent hydraulic jacking formwork platform for highrise building
    Intelligent hydraulic jacking formwork platform for highrise building

 


Warning: in_array() expects parameter 2 to be array, string given in /www/wwwroot/china-eng.com/wp-content/themes/theme/page-resources.php on line 48